Sunningdale Road Widening and Medway Creek Bridge Replacement

Official title: Sunningdale Road Widening

Open Community Planning Housing & Communities Transportation
London is widening Sunningdale Road from two lanes to four between Wonderland Road and Villagewalk Boulevard. The project includes replacing the Medway Creek Bridge, adding cycle tracks and sidewalks on both sides, and upgrading water and sewer infrastructure. Construction starts spring 2026 and runs through 2027.

Why This Matters

Drive, bike, or walk on Sunningdale Road? Expect major detours for two years. The Medway Creek Bridge will be closed during construction. Live nearby? Construction noise and traffic changes are coming. The upside: better cycling infrastructure and a wider, safer road when it's done.

What Could Change

Sunningdale Road doubles from 2 to 4 lanes with new turn lanes and medians. Cycle tracks and sidewalks get added on both sides. The Meadowlands Way intersection gets full traffic signals. New storm and sanitary sewers go in, along with watermain replacement.

Key Issues

  • How will traffic be managed during the two-year construction period?
  • What are the impacts of the Medway Creek Bridge closure on local residents?
  • How will the new cycling and pedestrian infrastructure connect to existing routes?

How to Participate

  1. Review the Sunningdale Road Widening Presentation for project details and construction plans.
  2. Contact the project engineer Jenna Van Lanen at jvanlane@london.ca or call (519) 661-2489 ext. 5806 with questions or to request accommodations.
  3. Review the Sunningdale Road Environmental Assessment for background on the project.

Events

Date Event Location Actions
December 10, 2025 Virtual Public Update Meeting Virtual
December 11, 2025 In-Person Public Meeting

Submit Your Input