Stormwater Management Approval for R.W. Tomlinson - Rideau Road, Gloucester
Official title: R. W. TOMLINSON LIMITED - Environmental Compliance Approval (sewage)
R.W. Tomlinson Limited wants approval to build stormwater management infrastructure at their Gloucester site. The system would include ditches, culverts, and a stormwater pond to control runoff quality and quantity. Treated water would discharge into an existing roadside ditch along Albion Road.
Why This Matters
Live near Rideau Road and Albion Road in Gloucester? This stormwater system will affect where runoff from this industrial site ends up. If you rely on nearby water sources or are concerned about local drainage, this matters to you.
What Could Change
If approved, R.W. Tomlinson would be authorized to build and operate stormwater infrastructure including a retention pond. The system would discharge treated runoff into the Albion Road ditch. Conditions may be attached regarding water quality monitoring and maintenance requirements.
Key Issues
- Should the stormwater discharge to the Albion Road ditch be approved?
- Are the proposed quality and quantity controls adequate to protect local water?
How to Participate
- Visit this consultation on the Environmental Registry to submit your comments before the deadline.
- You can also email your feedback to enviropermissions@ontario.ca or call 1-800-461-6290 for more information.
- Some supporting materials may only be available in person. Contact the ministry to request access.