Storm Sewer Approval for Heart Lake Road Development in Brampton
Official title: KSV Restructuring Inc., in its capacity as the court-appointed receiver Vandyk-Heart Lake Limited - Environmental Compliance Approval (sewage)
A court-appointed receiver is seeking approval to build storm sewers for a property at 10194 Heart Lake Road in Brampton. The new sewers would connect to the city's existing storm drainage system. This is a standard environmental permit for managing rainwater runoff from the site.
Why This Matters
Live near Heart Lake Road in Brampton? This affects how rainwater drains from a development site in your area. Storm sewers determine where water flows during heavy rain—and whether it causes flooding or pollution downstream.
What Could Change
If approved, the receiver can install storm sewers connecting to Brampton's existing drainage network. The permit would set conditions for construction and stormwater management at the site.
Key Issues
- Should the storm sewer connection to existing infrastructure be approved?
- What conditions should apply to stormwater discharge from this site?
How to Participate
- Review the proposal details on this consultation page. Reference ERO number 025-1251 in any correspondence.
- Submit your comments online through the ERO portal, or email enviropermissions@ontario.ca with your feedback.
- You can also mail comments to: Client Services and Permissions Branch, 135 St Clair Ave West, 1st Floor, Toronto, ON M4V 1P5.