Liquid Soil Processing Facility Permit - Port Perry

Official title: SOUTHVIEW HYDROVAC INC. - Environmental Compliance Approval (waste)

Closed Regulations & Permits Environment & Climate
Southview Hydrovac wants to open a facility in Port Perry that processes liquid soil slurry from hydro-vac trucks and drilling operations. The 9-acre site at 144 North Port Road would receive up to 300 cubic metres of material daily, separating water from soil. Operations would run 7 a.m. to 7 p.m., Monday to Saturday.

Why This Matters

Live near Port Perry? This facility would operate six days a week in your area. Truck traffic on North Port Road would increase. If you have concerns about noise, dust, or environmental impacts, now's the time to speak up.

What Could Change

If approved, Southview Hydrovac could process liquid soil at this location under provincial environmental rules. The permit would set limits on daily volumes, operating hours, and environmental controls. Conditions may require dust suppression, noise limits, or water management measures.

Key Issues

  • Should this liquid soil processing facility be approved at this location?
  • Are the proposed operating hours and volumes appropriate for this area?

How to Participate

  1. Review the proposal details on this consultation page. Note the ERO number 025-1311 for your submission.
  2. Submit your comment online through the ERO portal, or email enviropermissions@ontario.ca with the ERO number in your message.
  3. You can also mail comments to: Client Services and Permissions Branch, 135 St Clair Ave West, 1st Floor, Toronto, ON M4V 1P5.