Fort McMurray Flood Study - Public Feedback on Draft Maps
Official title: Fort McMurray flood study engagement
Alberta gathered public feedback on draft flood reports and maps for Fort McMurray. The study helps governments and residents understand flood risks and protect properties. Two rounds of online surveys collected input in 2020 and 2023-2024. The feedback has now been used to finalize the flood study.
Why This Matters
Live in Fort McMurray or the surrounding area? This flood study affects your property insurance, building permits, and emergency planning. The final maps determine which areas are considered high-risk for flooding.
What Could Change
The finalized flood maps will guide development decisions in Fort McMurray. Properties in newly designated flood zones may face building restrictions or higher insurance costs. Municipal planning and emergency response will be updated based on the study.
Key Issues
- Are the draft flood maps accurate for your area?
- Do the flood reports reflect local conditions and concerns?
What Happened
Albertans provided feedback through two rounds of online surveys: July 20 to August 31, 2020, and December 4, 2023 to February 12, 2024. The feedback was used to finalize the Fort McMurray flood study.