Liquid Soil Processing Facility Permit - Port Perry

Official title: SOUTHVIEW HYDROVAC INC. - Environmental Compliance Approval (waste)

Open Regulations & Permits Environment & Climate
Southview Hydrovac wants to open a facility in Port Perry that processes liquid soil slurry from hydrovac trucks and drilling operations. The 9-acre site at 144 North Port Road would handle up to 300 cubic metres of material daily, separating water from soil. Operations would run 7 a.m. to 7 p.m., Monday to Saturday.

Why This Matters

Live near Port Perry? This facility would operate six days a week in your area. Truck traffic would increase on North Port Road. If you're concerned about noise, dust, or water quality in the Township of Scugog, now's the time to weigh in.

What Could Change

If approved, Southview Hydrovac could process up to 300 cubic metres of liquid soil daily at this location. The permit would set conditions for operating hours, waste handling, and environmental controls. The Ministry may impose requirements for dust suppression, water management, or noise limits.

Key Issues

  • Should this liquid soil processing facility be approved at 144 North Port Road in Port Perry?
  • What environmental conditions should apply to the facility's operations?

How to Participate

  1. Review the proposal details on this consultation page. Include ERO number 025-1311 in any correspondence.
  2. Submit your comment online through the ERO portal, or email enviropermissions@ontario.ca with your feedback.
  3. You can also mail comments to Client Services and Permissions Branch, 135 St Clair Ave West, 1st Floor, Toronto, ON M4V 1P5.

Submit Your Input

Tips for Your Submission